교원프로필

이을범 사진
교원에 대한 정보를 나타내는 표입니다.
성명 이을범
소속 철강 · 에너지소재대학원
전화번호 279-0136
E-mail dreblee@postech.ac.kr
Homepage http://pmc.postech.ac.kr

학력

  • 1997.08 ~ 2000.12 UNIV. OF CALIFORNIA AT BERKELEY (박사-토목공학)
  • 1986.03 ~ 1988.02 한국과학기술원 (석사-토목공학)
  • 1982.03 ~ 1986.02 서울대학교 (학사-농공학)

주요경력

  • 2000.10 ~ 2012.05 : UC BERKELEY 교통연구소
  • 1988.03 ~ 2002.12 : 현대건설(주)

전문분야

학술지

국제전문학술지

  • INTEGRATING CA4PRS V.3 ROAD WIDENING SCHEDULE MODULE INTO US HIGHWAY EARLY CONSTRUCTABILITY PROCESS: CALIFORNIA SR-91 CORRIDOR IMPROVEMENT PROGRAM CASE STUDY, Transport, , 35, 1-19 (2020)
  • Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects, ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, , 27, 2859-2891 (2020)
  • Performance evaluation of normalization-based CBR models for improving construction cost estimation, Automation in Construction, , 119, - (2020)
  • A method for the empirical formulation of current profile, SHIPS AND OFFSHORE STRUCTURES, , 14, 176-192 (2019)
  • Method for Predicting Raw Material Prices for Product Production over Long Periods, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, , 145, - (2019)
  • Reducing Voltage Volatility with Step Voltage Regulators: A Life-Cycle Cost Analysis of Korean Solar Photovoltaic Distributed Generation, Energies, , 12, 652- (2019)
  • A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects, Sustainability, , 11, - (2019)
  • Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses, Sustainability, , 11, - (2019)
  • The Efficacy of the Tolling Model’s Ability to Improve Project Profitability on International Steel Plants, Energies, , 12, 1221- (2019)
  • Reducing the Superheating of Extraction Stream on Advanced-Ultra Super Critical Power Plants with Regenerative Turbines in South Korea: An Economic Analysis, Energies, , 12, 1681- (2019)
  • Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process, ENERGIES, , 12, - (2019)
  • Geographic Information System-Based Framework for Estimating and Visualizing Unit Prices of Highway Work Items, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, , 145, - (2019)
  • A Forecast Model for the Level of Engineering Maturity Impact on Contractor's Procurement and Construction Costs for Offshore EPC Megaprojects, ENERGIES, , 12, - (2019)
  • A Digitization and Conversion Tool for Imaged Drawings to Intelligent Piping and Instrumentation Diagrams (P&ID), ENERGIES, , 12, - (2019)
  • Electrical Power Characteristics and Economic Analysis of Distributed Generation System Using Renewable Energy: Applied to Iron and Steel Plants, Sustainability, , 11, - (2019)
  • Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca), Sustainability, , 10, 179- (2018)
  • Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings, Sustainability, , 10, 701- (2018)
  • A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk, Sustainability, , 10, 747- (2018)
  • Optimal Investment Timing with Investment Propensity Using Fuzzy Real Options Valuation, International Journal of Fuzzy Systems, , 20, 1888-1900 (2018)
  • Balancing Project Financing and Mezzanine Project Financing with Option Value to Mitigate Sponsor’s Risks for Overseas Investment Projects, Sustainability, , 10, 1498- (2018)
  • Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process, SUSTAINABILITY, , 10, - (2018)
  • Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors' Schedule-Cost Performance for Offshore Oil and Gas EPC Projects, SUSTAINABILITY, , 10, - (2018)
  • Power Plant Economic Analysis: Maximizing Lifecycle Profitability by Simulating Preliminary Design Solutions of Steam-Cycle Conditions, ENERGIES, , 11, - (2018)
  • Learning method for knowledge retention in CBR cost models, Automation in Construction, , 96, 65-74 (2018)
  • ANALYSIS OF THE CAUSES AND LEVEL OF MAINTENANCE FOR ENTERPRISE SYSTEMS IN CONSTRUCTION COMPANIES, JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, , 24, 499-507 (2018)
  • Recommended Finite Element Formulations for the Analysis of Off-shore Blast Walls in an Explosion, LATIN AMERICAN JOURNAL OF SOLIDS AND STRUCTURES, , 15, 1-32 (2018)
  • Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants, Energies, , 11, 2850- (2018)
  • Optimization Simulation, Using Steel Plant Off-Gas for Power Generation: A Life-Cycle Cost Analysis Approach, ENERGIES, , 11, - (2018)
  • Ore Composition's Impact on Smelting Profitability: An Optimum Pricing Index Model for Long-Term Nickel Ore Feedstock Purchasing Agreements, APPLIED SCIENCES-BASEL, , 8, - (2018)
  • A METHOD FOR ANALYZING THE EFFECT OF IMPLEMENTING AN ENTERPRISE SYSTEM BASED ON THE COMPLEXITY OF ACTIVITIES, Journal of Civil Engineering and Management, , 24, 526-536 (2018)
  • Risk Assessment and Mitigation Model for Overseas Steel-Plant Project Investment with Analytic Hierarchy ProcessFuzzy Inference System, SUSTAINABILITY, , 10, - (2018)
  • Prediction method of real discount rate to improve accuracy of life-cycle cost analysis, Energy and Buildings, , 135, 225-232 (2017)
  • Probabilistic cash flow-based optimal investment timing using two-color rainbow options valuation for economic sustainability appraisement, Sustainability (Switzerland), , 9, - (2017)
  • Automatic Sequence Selection and Cost Calculation for Maintenance and Rehabilitation in Highway Life-Cycle Cost Analysis (LCCA), International Journal of Transportation Science and Technology (IJTST), , 4, 61-76 (2015)
  • Fatigue Risk Management for Construction Worker on Rapid Renewal Highway Projects, Journal of the Transportation Research Board, , , - (2013)
  • Life Cycle Energy Consumption and GHG Emission from Pavement Rehabilitation with Different Rolling Resistance, Journal of Cleaner Production, , 33, 86-96 (2012)
  • Value Analysis Using Performance Attributes Matrix for Highway Rehabilitation Projects: California Interstate 80 Sacramento Case, Journal of the Transportation Research Board, , , 34-43 (2011)
  • Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis: Validation of California Interstate 710 Project, Phase 1, Journal of the Transportation Research Board, , , 23-32 (2011)
  • Economic Benefits Assessment of Accelerated Pavement Testing Research in California: Case Study, Journal of the Transportation Research Board, , , 137-146 (2011)
  • Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks, Journal of the Transportation Research Board, , , 38-45 (2008)
  • State-of-practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California., Journal of Construction Engineering and Management, , 133, 105-113 (2007)
  • Productivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction., Journal of Construction Engineering and Management, , 133, 798-806 (2007)
  • Implementation of automated travel-time information and public reaction on urban highway rehabilitation, Journal of Transportation Engineering, , 132, 808-816 (2006)
  • Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network, Journal of the Transportation Research Board, , , 3-10 (2006)
  • Automated work zone information system an urban freeway rehabilitation - California implementation, Journal of the Transportation Research Board, , , 77-85 (2006)
  • Fast-Track Urban Freeway Rehabilitation with 55-hour Extended Weekend Closures: I-710 Long Beach Case Study, Journal of Construction Engineering and Management, , 132, 465-472 (2006)
  • Knowledge-based Scheduling Analysis Software for Highway Rehabilitation and Reconstruction Projects., Journal of the Transportation Research Board, , , 15-24 (2005)
  • Accelerated Pavement Rehabilitation and Reconstruction with Long-life Asphalt Concrete on High-trafficked Urban Highway., Journal of the Transportation Research Board, , , 56-64 (2005)
  • Planning urban highway reconstruction with traffic demand affected by construction schedule, Journal of Transportation Engineering, , 131, 752-761 (2005)
  • Integrated Design/Construction/Operations Analysis for Fast-track Urban Freeway Reconstruction., Journal of Construction Engineering and Management, , 131, 1283-1291 (2005)
  • Computer simulation model: Construction Analysis for Pavement Rehabilitation Strategies., Journal of Construction Engineering and Management, , 131, 449-458 (2005)
  • Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis., Journal of Infrastructure Management Systems, , 11, 250-257 (2005)
  • Construction productivity analysis for asphalt concrete pavement rehabilitation in urban corridors, Journal of the Transportation Research Board, , , 285-294 (2002)
  • Case Study of Urban Concrete Pavement Reconstruction On Interstate 10., Journal of Construction Engineering and Management, , 128, 49-56 (2002)
  • Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors., Journal of the Transportation Research Board, , , 13-22 (2000)

국내전문학술지

  • Analysis on real discount rate for prediction accuracy improvement of economic investment effect, 한국건설관리학회지, , 16/1, 101-109 (2015)

일반학술지

  • Multifaceted Public Outreach and Cost-Benefit Analysis for Its Effectiveness Validation, Journal of Construction Management and Economics, , , 771-782 (2009)
  • Multicool: A Multi-layer Asphalt Pavement Cooling Tool for Temperature Prediction During Construction., The International Journal of Pavement Engineering, , 2, 169-185 (2001)
  • Long-Life Rehabilitation Design And Construction: I-710 Freeway, Long Beach, California., Transportation Research Circular, , , - (2001)

학술회의논문

  • Text-mining and Natural Language Processing(NLP) Application to engineering EPC Projects Invitation to Bid(ITB) based on FIDIC Silver Book, Text-mining and Natural Language Processing(NLP) Application to engineering EPC Projects Invitation to Bid(ITB) based on FIDIC Silver Book, 0, 0, - (2019)
  • Delay Liquidated Damages (DLDs) Mitigation Model using Earned Schedule (ES)-based algorithm for Engineering-Procurement-Construction (EPC) projects, Delay Liquidated Damages (DLDs) Mitigation Model using Earned Schedule (ES)-based algorithm for Engineering-Procurement-Construction (EPC) projects, 0, 0, - (2019)
  • Development of AI-based Engineering Big Data Integrated Analysis System for Decision-making Support in the Engineering-Procurement-Construction(EPC) Industry, Development of AI-based Engineering Big Data Integrated Analysis System for Decision-making Support in the Engineering-Procurement-Construction(EPC) Industry, 0, 0, - (2019)
  • Smart 4D process visualization solution using BIM, New Area of Future Technology - BIM Conference 2019, 0, 0, - (2019)
  • Complement of 3D scanning using image-based 3D modeling, New Area of Future Technology - 2019 BIM COnference, 0, 0, - (2019)
  • A Study of the AI Based Engineering Big Data Integrated Analysis Support System Development Methodology, KICEM Annual Conference-2018, 0, 0, - (2018)
  • Oil & Gas Project Cost Estimation: Tools & Practice, Offshore Korea Technical Conference 2017, 0, 0, - (2017)
  • Oil & Gas Project Cost Estimation: Tools & Practice, Offshore Korea Technical Conference 2017, 0, 0, - (2017)
  • Contractor’s Liabilities and Damages in Mega-offshore Projects: Project Financing Bankability Requirements, OFFSHORE KOREA TECHNICAL CONFERENCE 2016, 0, 0, - (2016)
  • IMPLEMENTING APPLICATION TOOL of LIFE CYCLE COST ANALYSIS (LCCA) for HIGHWAY MAINTENANCE and REHABILITATION in CALIFORNIA, 6TH INTERNATIONAL CONFERENCE ON CONSTRUCTION ENGINEERING AND PROJECT MANAGEMENT, 0, 0, - (2015)
  • Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project, INTERNATIONAL CONFERENCE ON CONSTRUCTION ENGINEERING AND PROJECT MANAGEMENT, 0, 0, - (2015)
  • Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Projects: Contractor’s Perspective, INTERNATIONAL CONFERENCE ON CONSTRUCTION ENGINEERING AND PROJECT MANAGEMENT, 0, 0, - (2015)
  • Cost Estimate Model of Transportation Management Plan (TMP) Strategies for Highway Construction Projects, JOURNAL OF THE TRANSPORTATION RESEARCH BOARD, 0, 0, - (2013)
  • Life Cycle Environmental Impacts From Asphalt Pavement Rehabilitation With Different Rolling Resistance, JOURNAL OF THE TRANSPORTATION RESEARCH BOARD, 0, 0, - (2012)
  • Garnering Public Support by Implementing a Comprehensive Public Outreach Program, JOURNAL OF THE TRANSPORTATION RESEARCH, 0, 0, - (2007)
  • Dynamic Approach to Public Outreach for Minimizing Traffic Inconvenience in Urban Highway Rehabilitation, JOURNAL OF THE TRANSPORTATION RESEARCH BOARD, 0, 0, - (2006)
  • Application of Macro- and Microscopic Simulations for the Traffic Planning of Urban Highway Reconstruction, JOURNAL OF TRANSPORTATION RESEARCH BOARD, 0, 0, - (2005)
  • Fast-Track Asphalt Concrete Pavement Rehabilitation on I-710 Long Beach (CA) during 55-hour Weekend Closures, JOURNAL OF TRANSPORTATION RESEARCH BOARD, 0, 0, - (2004)

학회발표

  • Lexicon based Natural Language Processing (NLP) and Semantic Analysis of Contractual Risks on Engineering, Procurement & Construction (EPC) projects, LECTURE NOTES IN NETWORKS AND SYSTEMS, 0, 0, - (2020)
  • Smart-tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-plant Blast-furnace Revamping Project in Korea, Computer-Aided Civil and Infrastructure Engineering, 0, 0, - (2020)
  • To develop an intelligent integrated support system for engineering project (E-PMS): DECRIS and DLDs analysis, Proceedings of the 37th International CIB W78 Conference 2020, 0, 0, - (2020)
  • DEVELOPMENT OF AI-BASED ENGINEERING BIG DATA INTEGRATED ANALYSIS SYSTEM FOR DECISION-MAKING SUPPORT IN THE ENGINEERING-PROCUREMENT- CONSTRUCTION (EPC) INDUSTRY, Proceedings of the 37th International CIB W78 Conference 2020, 0, 0, - (2020)
  • Application of Natural Language Processing (NLP) and Text-mining of Big-data to Engineering-Procurement-Construction (EPC) Bid and Contract Documents, 2020 6th Conference on Data Science and Machine Learning Applications (CDMA), 0, 0, - (2020)
  • A Study on the Application of AWP Process and Integrated Platform for Productivity Improvement in Construction Projects, A Study on the Application of AWP Process and Integrated Platform for Productivity Improvement in Construction Projects, 0, 0, - (2019)
  • Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractor’s Schedule-Cost Performance for Offshore Oil and Gas EPC Projects, Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractor’s Schedule-Cost Performance for Offshore Oil and Gas EPC Projects, 0, 0, - (2019)
  • Automatic Development of Material Requisition for Purchasing Order for EPC Projects, Automatic Development of Material Requisition for Purchasing Order for EPC Projects, 0, 0, - (2019)
  • AI-based big-data decision-making support systems for Korean contractor’s life-cycle project management of overseas Engineering-Procurement-Construction, 2019 International Conference on Big Data Engineering (BDE), 0, 0, - (2019)
  • intelligent- PM(Project Management) for Smart Engineering, Offshore Korea Technical Conference 2018, 0, 0, - (2018)
  • Lessons Learned from Applying Earned Value Management System to Infrastructure Construction Project: Case Study, 2017 International Conference on Construction Engineering and Project Management(ICCEPM), 0, 0, - (2017)
  • Lessons Learned from Applying Earned Value Management System to Infrastructure Construction Project: Case Study, 2017 International Conference on Construction Engineering and Project Management(ICCEPM), 0, 0, - (2017)
  • Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A.: Automatic M&R Sequence Selection, ., 0, 0, - (2013)
  • Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation, ., 0, 0, - (2013)
  • A Forensic Case Study of a Refinery Upgrading Project in Thailand : Lessons Learned Implementation, ., 0, 0, - (2012)
  • Enhancement of EPC Plant Project Management from Lessons Learned: A Case Study of Gas Gathering Project in Nigeria, ., 0, 0, - (2012)
  • Enhancement of a Life-Cycle Cost Analysis Tool and its Implementation in California, U.S.A, ., 0, 0, - (2012)
  • I-15 Ontario Project: Technology Implementation for Accelerated Concrete Pavement Rehabilitation, ., 0, 0, - (2009)
  • CA4PRS: A Decision-support Tool for Rapid Highway Renewal, ., 0, 0, - (2009)
  • Traffic Monitoring Study With Surveillance Systems:I-15 Devore II Rehabilitation Project In California, ., 0, 0, - (2008)
  • CA4PRS: A Constructability Analysis Tool for Urban Highway Rehabilitation Projects, ., 0, 0, - (2007)
  • Innovative Technologies And Proactive Public Outreach to Minimize Traffic Inconvenience In Urban Highway Rehabilitation, ., 0, 0, - (2007)
  • Accelerated Long-life Asphalt Concrete Pavement Rehabilitation: I-710 Long Beach (CA) Project Experience, ., 0, 0, - (2007)
  • Productivity Issues and Lessons-Learned From Two Long-Life Urban Freeway Concrete Rehabilitation Projects In California, ., 0, 0, - (2006)
  • Traffic Demand Reduction Using an Automated Work Zone Information System for Urban Freeway Rehabilitation, ., 0, 0, - (2006)
  • CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies) Software, ., 0, 0, - (2006)
  • Innovative Fast-Track Approach to Concrete Pavement Rehabilitation in Urban Highway Network, ., 0, 0, - (2006)
  • Handling the demand: Automated Work Zone Information System have been reducing traffic demand through construction work zones, ., 0, 0, - (2006)
  • Evaluation of Automatic Work Zone Information System for Urban Freeway Reconstruction with High Traffic Volume, ., 0, 0, - (2005)
  • Innovation and Technologies for Accelerated Highway Rehabilitation Projects: CA4PRS Implementation, ., 0, 0, - (2005)
  • A Validation Study of Microscopic Traffic Simulations for Urban Freeway Reconstruction with High-traffic Volume, ., 0, 0, - (2005)
  • Innovative Approach to Rapid Rehabilitation of Highway Concrete Pavement under High-traffic Volumes, ., 0, 0, - (2005)
  • Concrete Pavement in Desert Environments: An Investigation of Design and Construction Issues, ., 0, 0, - (2005)
  • Accelerated Pavement Rehabilitation on Urban Highways: innovative approach in California (paper # 7448)., ., 0, 0, - (2005)
  • A Construction Planning and Evaluation Tool for Urban Freeway Rehabilitation Projects., ., 0, 0, - (2004)
  • CA4PRS Generates Pavement Rehabilitation Strategies, ., 0, 0, - (2004)

단행본

  • Logistics Operations and Management for Recycling and Reuse, Springer, 173, LEE, EB (2021)
  • Life-Cycle Costing: For Analysis, Management and Maintenance of Civil Engineering Infrastructure (Ch 4: Pavement type selection for highway rehabilitation based on a life-cycle cost analysis), Whittles Publishing, 224, 이을범 (2015)
  • Life-Cycle Costing: For Analysis, Management and Maintenance of Civil Engineering Infrastructure,, Whittles Publishing, 224, John W. Bull (2015)
  • Constructability Concepts and Practice: Special Publication, ASCE, 149, LEE, EB (2007)

연구실적

  • DSME PM 전문인력 육성과정, 대우조선해양(주) 옥포조선소 (2012-2013)
  • 해영플랜트 NEEDS PROFILE 개발, 한국조선협회 (2012-2013)
  • 해양플랜트 NEEDS PROFILE 개발, 한국조선해양플랜트협회 (2012-2013)
  • 대우조선해양 PM 및 EM 전문인력 육성과정, 대우조선해양(주) 옥포조선소 (2013-2014)
  • 연구개발과제, 포항공과대학교 (2013-2022)
  • 해양플랜트 전문인력 양성, 한국조선해양플랜트협회 (2013-2014)
  • PM 전문인력 육성 교육, 삼성중공업(주) (2013-2014)
  • PM 전문인력 육성 교육, 한국조선해양(주) (2014-2014)
  • PM 역할 분석을 통한 엔지니어링 프로세스 개선 방안, (주)포스코 (2014-2015)
  • DSME EPC 역량교육 전문가과정(PM-3기) 위탁 교육, 대우조선해양(주) 옥포조선소 (2014-2014)
  • 인건비풀링과제, 포항공대산학협력단 (2014-2015)
  • EPC 역량교육 전문가과정, 대우조선해양(주) 옥포조선소 (2015-2015)
  • 철강 프로젝트의 공사비 산정 정확도를 향상시키기 위한 설계 기준 제안, (주)포스코 (2015-2016)
  • 철강프로젝트의 공사비 산정 방범론 모델 개발연구, 포항공대산학협력단 (2015-2016)
  • 연구개발과제[2015년 신설], 포항공과대학교 (2015-2027)
  • 2015년 포스코플랜텍 엔지니어링 전문인력 양성, (주)포스코플랜텍 (2015-2016)
  • [포스코]철강엔지니어링전문가 육성 단기교육 과정, (주)포스코 (2015-2016)
  • [포스코건설]철강엔지니어링전문가 육성 단기교육 과정, (주)포스코건설 (2015-2016)
  • [포스코ICT]철강엔지니어링전문가 육성 단기교육 과정, (주)포스코아이씨티 (2015-2016)
  • 철강 플랜트의 가상건설 적용을 위한 기준 정립, (주)포스코 (2016-2017)
  • [기술개발과제]철강 플랜트의 가상건설 적용을 위한 기준 정립-방법론 모델 개발 연구, 포항공대산학협력단 (2016-2017)
  • SPB 기술 상용화를 위한 대형 ENGINEERING PROCESS 최적화, (주)포스코 (2016-2017)
  • [기술개발과제]SPB 기술 상용화를 위한 대형 ENGINEERING PROCESS 최적화-방법론 모델 개발 연구, 포항공대산학협력단 (2016-2017)
  • 4D BIM 기반 가상시공 업무 정착 및 5D BIM 적용을 위한 연구, (주)포스코 (2016-2018)
  • [기술개발비과제]4DBIM기반 가상 시공 업무 정착 및 5D BIM 적용을 위한 연구, 포항공대산학협력단 (2016-2018)
  • 해외 인프라 공정-원가 통합관리체계(WATCH-DOG SYSTEM) 고도화 및 구축지원, (주)포스코건설 (2017-2017)
  • 수주 경쟁력 향상을 위한 발전공정 개선 프로세스(PERFORMANCE-COST) 최적화, (주)포스코건설 (2016-2018)
  • 엔지니어링 프로젝트의 지능형 통합관리 지원 시스템 개발, 한국산업기술평가관리원 (2017-2017)
  • 시스템엔지니어링 개념의 설계기반 구매 엔지니어링 관리지원 시스템 개발, 한국산업기술평가관리원 (2017-2018)
  • 학생인건비통합관리과제, 포항공대산학협력단 (2018-2040)
  • BIM 기반 업무 정착을 위한 3D SCANNING/MODELING 업무표준화 및 시험적용, (주)포스코 (2018-2019)
  • [4.15857_기술개발비]3D BIM의 PM과 EM APPLICATION 확대를 위한 기본연구, 포항공대산학협력단 (2018-2019)
  • 엔지니어링 프로젝트의 지능형 통합관리 지원 시스템 개발, 한국산업기술평가관리원 (2018-2018)
  • 시스템엔지니어링 개념의 설계기반 구매 엔지니어링 관리지원 시스템 개발, 한국산업기술평가관리원 (2018-2018)
  • AI기반 엔지니어링 빅데이터 통합 분석 지원 시스템 개발, 한국산업기술평가관리원 (2018-2019)
  • 4D 기반 3고로 개수 실시간 시공 관리를 위한 SMART TRACKING SYSTEM 개발, (주)포스코 (2019-2020)
  • [4.17559_기술개발]기술과제: 4D 기반 3고로 개수 실시가 시공 관리릉 위한 SMART TRACKING 및 BIM 4D SIMULATION모니터링 시스템 구축, 포항공대산학협력단 (2019-2020)
  • 엔지니어링 프로젝트의 지능형 통합관리 지원 시스템 개발, 한국산업기술평가관리원 (2019-2019)
  • 시스템엔지니어링 개념의 설계기반 구매 엔지니어링 관리지원 시스템 개발, 한국산업기술평가관리원 (2019-2019)
  • AI기반 엔지니어링 빅데이터 통합 분석 지원 시스템 개발, 한국산업기술평가관리원 (2019-2020)
  • SAFETY FACTOR를 반영한 포스코 型 4D BIM 기반 SIMULATION SYSTEM 개발, (주)포스코 (2020-2021)
  • [4.19452_기술개발]SAFETY FACTOR를 반영한 포스코 型 4D BIM 기반 SIMULATION SYSTEM 개발, 포항공대산학협력단 (2020-2021)
  • AI기반 엔지니어링 빅데이터 통합 분석 지원 시스템 개발, 한국산업기술평가관리원 (2020-2020)
  • AI 기반의 발주자 설비사양서 리스크 자동 검출 기술 개발, (주)포스코 (2021-2022)
  • AI기반 엔지니어링 빅데이터 통합 분석 지원 시스템 개발, 한국산업기술평가관리원 (2021-2021)
  • [4.21695_기술개발]AI 기반의 발주자 설비사양서 리스크 자동 검출 기술 개발, 포항공대산학협력단 (2021-2022)
  • 탄소저감모델 연계 배관-케이블 경로 설계 최적화 기술개발, 한국산업기술평가관리원 (2022-2022)

IP

  • 이을범,최소원, EPC 플랜트 및 엔지니어링 프로젝트의 의사 결정 지원을 위한 계약 리스크 추출 프로그램, 한국, C-2020-040502 (PR20)
  • 이을범, 플랜트 최적 설계를 위한 배관의 자동 라우팅 방법, 한국, 10-2019-0179750 (2021)
  • 이을범,최소원,김종현,권지수, 클라우드 기반의 머신러닝 플랫폼과 사전정의 모델을 활용한 엔지니어링 데이터 관리 및 분석 장치, 한국, 10-2020-0154618 (2020)
  • 이을범,최소원,김종현,권지수, 클라우드 기반의 머신러닝 플랫폼과 사전정의 모델을 활용한 엔지니어링 데이터 관리 및 분석 장치, 한국, 10-2020-0154618 (2020)
  • 이을범,김명훈, 플랜트 프로젝트 상세 설계 관리 방법 및 시스템, USA, 16/812,230 (2019)
  • 이을범, 이미지화된 PID 도면에서 설계 정보를 자동으로 인식하여 분류하는 방법, USA, 16/696,953 (2019)
  • 이을범,강성오,백흠경, 데이터베이스로 저장된 설계정보를 이용한 지능형 PID 도면의 자동 작성 방법, 한국, 10-2018-0152247 (2019)
  • 이을범, 이미지화된 PID 도면에서 설계 정보를 자동으로 인식하여 분류하는 방법, 한국, 10-2018-0152246 (2019)
  • 이을범, 이미지화된 PID 도면에서 설계 정보를 자동으로 인식하여 분류하는 방법, 한국, 10-2018-0152246 (2019)
  • 이을범, OMID- 인프라 재건설공사 공기단축 보너스 (인센티브) 및 공기지연 배상금 (디스인센티브) 최적산정 모델, 한국, 10-2018-0053783 (2018)
  • 이을범, 교통인프라 재건설공사 공기단축 인센티브 및 공기지연 디스인센티브 최적산정 모델링방법, 한국, 10-2018-0053783 (2018)
  • 이을범,김명훈, 플랜트 프로젝트 상세 설계 관리 방법 및 시스템, 한국, 10-2019-0027060 (2018)
  • 이을범,김명훈, 플랜트 프로젝트 상세 설계 관리 방법 및 시스템, 한국, 10-2019-0027060 (2018)